Analysis of Factors Affecting Labor Productivity in the Construction Project of RSU Bunda Padang Building
DOI:
https://doi.org/10.21063/jts.2026.V1302.0228-236Keywords:
labor productivity; construction project; RSU Bunda Padang buildingAbstract
The implementation of construction projects is required to achieve optimal quality, be completed on time, and within the planned budget. In the effort to achieve that success, labor productivity becomes one of the important factors that greatly influence the smooth execution of the project. A low level of labor productivity can cause various negative impacts, such as delays in project completion, increased implementation costs, and a decline in the quality of the work results. Therefore, an analysis of the factors affecting labor productivity is necessary so that the project implementation can run more effectively and efficiently. This study aims to identify the factor with the highest relative importance that affects labor productivity in the construction project of the RSU Bunda Padang building. The research method used is a quantitative method with data collection thru the distribution of questionnaires to respondents involved in the project. The data obtained were then analyzed using IBM SPSS V20 software to conduct validity and reliability tests. Next, the Relative Importance Index (RII) analysis is used to rank the factors that most influence labor productivity in the construction project. Based on the results of the validity and reliability tests, out of the 20 research variables, 19 variables were declared valid and reliable. The RII analysis results show that the availability of materials is the most influential factor on labor productivity, with an RII value of 0.9608.
References
Akadiri, P, O, Olomolaive & Chinyio, E, A 2013, ‘Multi-Criteria Evaluation Model for the Selection of Sustainable Materials for Building Projects. Automation in Construction’, vol. 30, no. 1, hh. 113-125. https://doi.org/10.1016/j.autocon.2012.10.004 Alvin, T & Waty, M 2020, ‘Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga Kerja pada Bangunan High Rise di Republik Indonesia’, JMTS: Jurnal Mitra Teknik Sipil, vol. 3, no. 4, hh. 1313-1326. https://doi.org/10.24912/jmts.v3i4.8366
Angelica, N, P & Puspasari, V, H, 2024, ‘Kajian Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Proyek Konstruksi’, Jurnal Basement, vol. 2, no. 1, hh. 37-44. https://doi.org/10.36873/basement.v2i1.12757
Bagaskara, J, S & Triana, M, I 2024, ‘Analisis Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja pada Proyek Pembangunan Perumahan Opra City Gresik Jawa Timur’, JUTIN: Jurnal Teknik Industri Terintegrasi, vol. 7, no. 2, hh. 980-995. https://doi.org/10.31004/jutin.v7i2.28204
Caroline, D & Sulistio, H 2018, ‘Pengaruh Peningkatan Produktivitas Terhadap Durasi Fabrikasi Besi Pada Proyek Indonesia 1 Dengan Crew Balance Chart’, JMTS: Jurnal Mitra Teknik Sipil, vol. 1, no. 1, hh. 1-8. https://doi.org/10.24912/jmts.v1i1.2222 Ervianto, W, I 2002, Manajemen Proyek Konstruksi, Andi, Yogyakarta Fassa, F, Wibowo, A & Soekiman, A 2021, ‘Sumber Daya Manusia di Industri Konstruksi Periode 2011 2020: Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga Kerja Konstruksi: Sebuah Tinjauan Sistematis. Simposium Nasional Teknologi Infrastruktur Abad ke-21’, hh. 249-254. Faustine, C & Waty, M 2022, ‘Peringkat Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga Kerja pada Proyek Konstruksi’, JMTS: Jurnal Mitra Teknik Sipil, vol. 5, no. 3, hh. 681-693. Felixius, J & Waty, M 2021, ‘Analisis Sisa Material dan Penyebab Utamanya pada Proyek Bangunan Rumah Tinggal’, JMTS: Jurnal Mitra Teknik Sipil, vol. 4, no. 1, hh. 343-352. https://doi.org/10.24912/jmts.v0i0.10393 Hernandi, Y & Tamtama, J, S 2020, ‘Faktor-Faktor yang Mempengaruhi Produktivitas Pekerja pada Pelaksanaan Konstruksi Gedung Bertingkat’, JMTS: Jurnal Mitra Teknik Sipil, vol. 3, no. 2, hh. 299-312. https://doi.org/10.24912/jmts.v3i2.6985
Latief, R, U, Anditiman, N, M, Rahim, I, R, Arifuddin, R & Tumpu, M 2023, ‘Labour Productivity Study in Construction Projects Viewed from Influence Factors’, Civil Engineering Journal, vol. 9, no. 3, hh. 583-595. https://doi.org/10.28991/CEJ-2023-09-03-07 Norjana, N & Zulfiati, R 2020, ‘Analisa Produktivitas Tenaga Kerja Terhadap Pekerjaan Kolom Dan Balok Beton Bertulang’, Jurnal Talenta Sipil, vol. 3, no. 2, hh. 82-86. http://dx.doi.org/10.33087/talentasipil.v3i2.33 Noviyarsi, Yulius, M, N, Bakar, Y & Suryani, E 2023, ‘Analisis Pengaruh Faktor-Faktor Produktivitas Kerja Proyek Konstruksi Dengan Relative Importance Index (RII) dan Regresi Linier Berganda’, JISI: Jurnal Integrasi Sistem Industri, vol. 19, no. 1, hh. 27-38. http://orcid.org/0000-0001-8835-5946
Nurhendi, R, N & Bastam, M, N 2024, ‘Tinjauan Faktor Utama Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Proyek Konstruksi Dengan Pendekatan Peringkat Relative Importance Index (RII)’, Jurnal Deformasi, vol. 9, no. 2, hh. 167-177. https://doi.org/10.31851/deformasi.v9i2.17136 Oktavio, K, Dharmawan, R, K & Nugraha, P 2020, ‘Survey Mengenai Faktor-Faktor yang Mempengaruhi Produktivitas Pekerja pada Beberapa Proyek Konstruksi di Surabaya’, Jurnal Dimensi Pratama Teknik Sipil, vol. 9, no. 1, hh. 141-148.
Pramata, A, B 2017, ‘Faktor yang Mempengaruhi Produktivitas Tenaga Kerja Konstruksi di Bungku Kab. Marowali Sulawesi Tengah’, Prosiding Seminar Nasional Hasil Penelitian & Pengabdian Kepada Masyarakat (SNP2M), 155-159. Sugiyono 2024, Metode Penelitian Kuantitatif, Kualitatif dan R&D, Alfabeta, Bandung. Thoengsal, J 2022, Produktivitas Sumber Daya Proyek Konstruksi. Insight Mediatama, Mojokerto. Toan, N, Q, Tam, N, T, Hai, D, T & Quy, N, L, D 2020, ‘Critical Factors Affecting Labor Productivity Within Construction Project Implementation: A Project Manage’s Perspective’, Entrepreneurship and Sustainability Issues.vol. 8, no. 2, hh. 751-763. https://doi.org/10.1080/23311975.2020.1863303 Trisno, D, Secio, E, W & Limant, S 2021, ‘Studi Awal pada Faktor yang Mempengaruhi Produktivitas Pekerjaan Konstruksi pada Bangunan di Surabaya dan Samarinda’, Jurnal Dimensi Pratama Teknik Sipil, vo. 10, no. 2, hh. 33-39. Urrahmi, M, Oktaviani, C, Z, Mubarak 2023, ‘Analisis Indikator Penilaian Produktivitas Tenaga Kerja Konstruksi Gedung di Kota Banda Aceh’, JMTS: Jurnal Mitra teknik Sipil, vol. 6, no. 1, hh. 31-38. https://doi.org/10.24912/jmts.v6i1.20803
Van Tam, N, Toan, N, Q, Hai, D, T & Quy, N, L, D 2020, ‘Critical factors construction labor productivity: A comparison between perceptions of project managers contractors’, Cogent Business & Management, vol. 8, no. 1, hh. 1-17. https://doi.org/10.1080/23311975.2020.1863303 Widiasant, I, Yolanda, Saputra, R, J, Handrawan, E, H, Falla, A, Mauldi, I & Joyonegoro, R, P 2024, ‘Analisis Faktor yang Mempengaruhi Produktivitas Tenaga Kerja pada Proyek Konstruksi’, Jurnal Ilmiah Manajemen dan Bisnis, vol. 6, no. 3, hh. 1199-1207. https://doi.org/10.37479/jimb.v6i3.23230






